The project involved completing detailed design of platforms and a walkway that were to be located on top of two existing dried biosolids silos. The purpose of the proposed platforms and walkway was to provide safe access for maintenance personnel to the valves and pipework located on the top of the silos. The completed design was to be compliant with AS1657:2018. Where it could not be made compliant due to onsite constraints, the non-compliances were to be captured for risk assessment and follow-up.
The existing silo arrangement had numerous pipes and nozzles in the location of the proposed platforms and walkway. To accurately design around these constraints a 3D point cloud scan was completed using MELs in-house 3D scanner. The point cloud was then used for detailed design & clash detection. Air filters and manway lids were also present on the silos. The ability of maintenance personnel to be able to access these items freely was to be maintained once the platforms and walkway were installed.
Both silos had a height of 15m and as a result a large amount of potential deflection was identified by the structural calculations. A sliding joint arrangement was designed between the fixed platforms and floating walkway to allow for the potentially large deflections.
On site NDT was completed during a planned silo outage to determine the thicknesses of the silo domes. The corrosion rate of the domes was estimated based on the thickness results. Finite Element Analysis (FEA) was completed on the platform to dome connections.
MEL provided fabrication & site installation assistance to ensure that the design drawings were being followed at all stages of construction.