Projects Completed
April 2010
Click on linked projects for more details:
- Recovery boiler rebuild and seismic upgrade
- NST PM2 hatch cover
- BOPDHB Laundry and Santon Block water heating upgrade
- Bay of Plenty Energy Screen Cleaner failure
- CHH Woodproducts New Chipper Building
- Recovery Boiler Pipe Bridge Replacement
- Machine Guarding Project
- CHH Tasman Pump Database
- Recovery Boiler side wall replacement
- Scheduling - Operating Room 3 Upgrade
- Weak Black Liquor tank inspection and repair
- Resolve Secondary black liquor heater vibration
- Investigate to conclude cause of repeated Refiner bearing failures
- Replacement of Cascade Evaporator
- Retube of Power boiler generating bank
- Routine annual inspection and reporting of Recovery boiler condition
- Detailed corrosion investigation and reporting for Recovery boiler
- Power boiler economiser replacement
- Steam turbine recommission
- Weld overlay of Recovery boiler side walls
- Boiler floor tube replacement
- Power boiler traveling grate repair/overhaul
- TMP Refiner overhaul
- Replacement of vapour domes in black liquor evaporators
- Paper machine drive shaft failure investigation
- Retube black liquor evaporators
- Refiner Drive shaft strain analysis
- Management of annual NDT program for pressure equipment
- Disc thickener shaft repairs
- Screw press overhauls
